Flipping House Series: The Mold House Finale
In our third and final installment of The Mold House we take a look at how our renovation turned out.
Here is a list of the repairs done on The Mold House:
- Removed drywall and flooring in basement and re-drywalled area
- Sanded and refinished hardwood floors
- New windows installed
- Re-glazed bathtub
- New bath vanity and fixtures
- Sump pump repair
- Panted house throughout
Main area after photos.
The 2 biggest areas we had to work on were the basement and the kitchen. Check out the after photos of how each turned out.
Basement
Kitchen Area
To learn more about Part-Time REI visit us at http://part-timerei.com/
Comments are closed.