Flipping House Series: The Mold House Finale

 

In our third and final installment of The Mold House we take a look at how our renovation turned out.

IMG_1530

Here is a list of the repairs done on The Mold House:

 

  • Removed drywall and flooring in basement and re-drywalled area
  • Sanded and refinished hardwood floors
  • New windows installed
  • Re-glazed bathtub
  • New bath vanity and fixtures
  • Sump pump repair
  • Panted house throughout

Main area after photos.

The 2 biggest areas we had to work on were the basement and the kitchen. Check out the after photos of how each turned out.

 

 

Basement

 

basement remodel Basement 03Staircase

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Kitchen Area

kithcen remodel kitchen 1 kitchen 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

To learn more about Part-Time REI visit us at http://part-timerei.com/

Or connect with us FB icon linked in icon

Erik Hitzelberger has been Real Estate Investor since 2007. While learning the ropes in the market down-cycle, he now teaches others how to use his systems and leverage other people’s expertise to achieve their own goals.

Erik Hitzelberger – who has written posts on Part Time REI.


Twitter Digg Delicious Stumbleupon Technorati Facebook Email

About Erik Hitzelberger

Erik Hitzelberger has been Real Estate Investor since 2007. While learning the ropes in the market down-cycle, he now teaches others how to use his systems and leverage other people's expertise to achieve their own goals.

Comments are closed.

Facebook