Flipping Houses: The Waterfall House-Part 2
Let’s take a look at the progress on The Waterfall House. If you remember this house had basically 3 big problems in addition to your basic rehabbing; painting, new carpet, etc.
The first problem we tackled was the plumbing bursting. We are repairing the broken plumbing, removing all the damage, and replacing everything.
2. Since the only bathroom on the first floor was the master bath, we really wanted to make it look nice. Thus, we decided to tile the floor and tub surround.
3. The 3rd problem we are tackling is the steep hill immediately behind the house. We will cut into the hill a little, add a retaining wall, and level the area at the end of the driveway to make it more usable.
Be sure to check back in a few weeks to see the how The Waterfall House turns out and how we plan on selling it. You won’t want to miss the after shots!
To learn more about Part-Time REI visit us at http://part-timerei.com/
Or visit us on FB at: https://www.facebook.com/PartTimeRei
Linked In http://www.linkedin.com/company/part-time-rei
Comments are closed.